
Shower Nozzle Inspection Schedule:
Daily: Visual pressure gauge check — confirm system is within operating range (20-35 bar for high-pressure showers).
Weekly: Inspect EVERY nozzle individually — ONE clogged nozzle creates ONE accelerated wear stripe on the fabric.
Monthly: Comprehensive system check — filters, pressure consistency, oscillation mechanism, piping integrity.
Quarterly: Chemical descaling of pipes and nozzles to remove mineral buildup.
After Every Fabric Change: Verify shower alignment with new fabric. This is the ideal time for thorough inspection since the machine is already stopped.
This answer is based on PAPTEX's expertise in Installation & Maintenance. PAPTEX provides engineered fabric solutions to 200+ paper mills worldwide.
Last updated: July 2026