Kraft Paper Mill — Turkey

Turkey
Kraft Paper (90–150 gsm)
Bellmer — 4,200 mm
750 m/min
6 weeks
—
An established Turkish kraft paper producer serving the packaging and construction materials sectors across Europe and the Middle East. The mill operates a wide-format paper machine with an annual output of 180,000 tons.
Average monthly press section downtime of 18 hours was the primary production bottleneck. The existing composite press fabric exhibited rapid surface wear and inconsistent dewatering performance, leading to frequent unplanned shutdowns for fabric inspection and replacement.
PAPTEX supplied a custom composite press fabric featuring a finer batt-on-mesh surface layer for improved sheet release and a reinforced base structure for dimensional stability under high nip loads. Optimized void volume distribution enhanced dewatering capacity while preventing sheet rewet.
Comprehensive press section survey, nip profile analysis, used felt forensics
Custom felt design, batt blend optimization, needling density tuning
Needle-punch production, chemical treatment, QC & dimensional verification
On-site supervision, tension & guiding calibration, break-in protocol
KPI verification, ROI analysis, maintenance interval optimization
Downtime reduced 40% (7 hours saved per month), production output increased 8%, and sheet moisture entering the dryer section dropped by 3 percentage points. The drier sheet reduced downstream steam demand, contributing an additional $50,000 in annual energy savings.
| KPI Metric | Before | After | Improvement |
|---|---|---|---|
| Press Downtime | 18 hrs/month | 11 hrs/month | -39% |
| Production Output | 100% (baseline) | 108% | 8% |
| Sheet Moisture | 52% | 49% | -6% |
| Fabric Life | 60 days | 75 days | 25% |
$165,000 annual savings through reduced downtime, extended fabric service life, and lower steam consumption. ROI achieved within 4 months.
“PAPTEX's press fabric enabled us to achieve an 8% production increase with zero capital investment. Their technical team's analysis of our nip configuration was the key differentiator.”
Get the complete Press Fabric Upgrade Reduced Downtime by 40% as a PDF — includes all KPIs, implementation timeline, and engineering notes. Share with your team or keep for reference.
Our engineering team will analyze your machine specifications and recommend the optimal PMC configuration — free of charge.
Talk to an Engineer